» Keystone
2009 Keystone Ferry Terminal
($920,000)

Replaced the existing timeber wingwalls with two new steel wingwalls at the ferry landing. Installed new steel pipe piles, steel diaphragms. Installed new rubber fenders and steel and timber rub faces.

 
 
American Construction Company
1501 Taylor Way  •  Tacoma, Washington 98421
phone: 253.254.0118  •  fax: 253.254.0155  •  email: