» Bellingham
2004 Port of Bellingham
Gate 2 Sediment
Remediation and Redevelopment

($2,500,000)

Constructed a new Travel Lift Pier. Installed new piling foundation and precast concrete panels. Dredged and disposed contaminated sediments, installed sheet pile wall, installed new guide piling and floats, removed and replaced existing timber pier decking.

 
 
American Construction Company
1501 Taylor Way  •  Tacoma, Washington 98421
phone: 253.254.0118  •  fax: 253.254.0155  •  email: