|
2004 Port of Bellingham
Gate 2 Sediment Remediation and Redevelopment ($2,500,000)
Constructed a new Travel Lift Pier. Installed
new piling foundation and precast concrete panels. Dredged and disposed contaminated sediments, installed sheet pile wall, installed new
guide piling and floats, removed and replaced existing timber pier decking.
|