|
1997 Hyundai / WUT Terminal ($14,400,000)
Constructed a 2,000 ft x 100 ft wide container
terminal pier using 150-ft long pre-stressed concrete piling, cast-in-place concrete caps,
pre-stressed and pre-cast deck panels, 50-ft gage crane rail system, precast pile fender system, and associated utilities.
|